Set the measurement boundary
Identify which equipment and time period the readings cover. Distinguish actual measurements from estimates.
MINELIFTER / energy
Prepare a metering and operating context for a qualified assessment.
Identify which equipment and time period the readings cover. Distinguish actual measurements from estimates.
Record production schedules, load variation and known metering gaps. No energy saving estimate is produced here.
Ask what additional measurements are required and how any proposed change would be evaluated against production and safety constraints.
BUILT FOR A BETTER TECHNICAL CONVERSATION